Iron Horse Energy Storage and Solar (BESS)

0045652_1.jpg
0045652_2.jpg
0045652_3.jpg
Location
Tucson, Arizona
Client
Signal Energy and E.ON
Scope

2 MWac PV array; 10 MW/2.5MWh energy storage

Roles
  • Civil Engineering
  • Structural Engineering/Foundation Design
  • Construction Support
  • Survey Staking
  • Issue for Review Plans
  • Issued for Construction Plans
  • Electrical Engineering
  • Record Drawings
  • Performance Verification
  • Water Resources
  • Stormwater Pollution Prevention Plan
  • Spill Prevention, Control, and Countermeasure Plans